Another weekend of outhouse construction has gone and passed, we arrived late Friday evening in the rain. Saturday brought oddly enough no bugs, yet it was damp and there loomed a thick heavy fog all around the lake. There was the occasional black-fly or mosquito but they obeyed the laws of the bug spray and left us in peace.

So we set to work, finishing off the bench and mounting the toilet seat. Once that was complete it was time to prepare the door for paint. The old green paint was cracked and peeling so the entire thing had to be sanded down before finally applying primer. The next step was to caulk some of the larger gaps between the boards and give it an initial coat of paint.

While we had our brushes full of primer it was time to coat the entire building. Unfortunately we ran out of painters tape before we could start painting the trim of the building.

Oh well at least the inside is done so it should be functional the next time we go out.